The Typical Construction Process
Most home buyers have a lot of questions about the construction of
their home: How long will it take to build? What happens when? What does
each step involve? When can we visit the site and see our home in
progress? When do we have to make final decisions about cabinets,
fixtures, flooring, and so on? When do building inspections take place?
Will we have a chance to inspect it ourselves before we take possession?
Below
is an outline of the typical construction process today. Bear in mind
that this is a generalized description—your own new home builder may use
a different approach. The process and schedule will also be affected by
the size and style of the house; the lot; the construction techniques
used; the amount of customization required; the number of municipal
inspections; whether the home is located in a large development;
availability of labour, and many other factors. Ask your builder to
explain the process for your home.
Phase One: Pre-construction
Before any construction begins, plans for your home are developed,
finalized and submitted to the municipal building permit office for
review. Permits may be required for all or some of the following work:
building, electrical, plumbing, septic system and sewer connection.
Prior
to this, a number of site tests may be conducted to examine the water
table, the soil and the bearing capacity of the ground and to conduct
environmental tests. With this information, final engineering
adjustments can be made to the plans.
Phase Two: Foundation
Your house is staked out and the land is prepared. Often, the topsoil
is removed and piled elsewhere for later use. Excavation is done, and
the footings (concrete slabs to support the foundation walls) are formed
and poured. Water, electricity, telephone and cable services may be
brought in at this time.
The foundation walls are erected (may
use poured concrete in temporary wooden forms or permanent insulated
blocks, concrete blocks or preserved wood, for instance). The foundation
may be insulated and damp-proofed. Weeping tiles are installed to drain
ground moisture away from the house. A municipal inspection of the
foundation may be conducted before the outside perimeter is backfilled.
At
this time, the builder may ask you to begin making your
selections—deciding on flooring, tiles, cabinets and so on. While it
will be weeks before these items are installed, they must be ordered
early to prevent delays later.
Phase Three: Framing
Exterior walls, interior partitions and the roof are assembled. This
usually means erecting a framing skeleton and applying an exterior
sheeting; or another framing technique may be used. Frames are built on
the floor, one wall at a time and then lifted in place. Roof trusses are
most often brought to the site ready for installation, and roofing is
completed as quickly as possible to prevent accidental damage as work
progresses on the lower parts of the home. Windows and doors are
installed. The builder's aim is to get to "lock-up" as quickly as
possible to protect the structure from the elements.
The basement
floor is installed. Electrical and plumbing services are roughed in,
and ducting for heating, cooling and ventilation is put in place.
At
this time, your municipality will probably require a structural
inspection to ensure that the home is being built according to building
code requirements. Electrical and plumbing inspections will likely be
conducted as well.
Phase Four: Interior and exterior work
For the next several weeks, a great deal of work will happen inside
and out, much of it at the same time, or overlapping. Proper scheduling
is key to smooth progress.
The exterior walls and the roof are
insulated, and a vapour barrier is applied. Another municipal inspection
may take place to ensure this work has been done properly, before the
drywall is installed. Heating and cooling systems are installed,
including fireplaces.
Walls and ceilings are painted, flooring is
laid, and kitchen and bathroom cabinets are installed. Plumbing and
electrical fixtures are put in, trim is applied, and interior doors are
hung.
Siding is applied on the outside, along with
eavestroughing, and porches and decks are installed. Final lot grading
is done, and the driveway and walkways are put in.
Several
additional municipal inspections may occur—for instance, after
completion of the interior to check stairs, handrails and other health
and safety related items, and/or after final grading outside. Plumbing
and electrical work will probably require final inspection.
During
this period, your builder will stay in regular contact with you, to
update you on progress and to meet deadlines for selecting finishes and
other decisions you may need to make.
Phase Five: From near-completion to hand-over
At this point, your builder and crew are busy completing the final
touches and cleaning up. You will be asked to do a walk-through of your
home with the builder. Any last-minute touch-ups will be done. On the
date of possession, you will be handed the keys-the home is now yours!
Change Orders
Signing a contract with your professional new home builder for a
brand new home is the culmination of an exciting process. You have found
the home you want and made the commitment to go ahead with the
purchase. You may have made minor changes to the builder's plans to
better suit your needs. And you may have chosen all the features that
will go into your new home. In some instances, though, this may not be
the end of your decision-making.
A visit to the lighting
supplier may trigger a desire for security lighting not included in the
contract for your new home. You may decide to go for the fireplace after
all or to enlarge the foyer after seeing working drawings. Or you may
simply want more electrical outlets.
Professional new home
builders will gladly attempt to accommodate any changes or additions you
want to make before construction of your home begins, or even when it
is in progress. But before you make any decisions, talk with your
builder.
- Sometimes even small changes can have a significant impact on cost or scheduling, particularly if construction is already under way. It may mean changing some aspect of the construction—for instance, a change in floor coverings may call for a different sub-flooring.
- Changes can also result in delays. A professional new home builder works with a tight construction schedule and subtrades who move from one task to another and one home to another according to a timetable.
- It is crucial that all changes or additions are documented as written change orders and signed by both parties. This eliminates misunderstandings and ensures that everyone, from the people in the sales office to the site crew, knows what has been agreed to.
- Change orders are considered extras to the contract. Ask your builder to explain how you are expected to pay for them. Adjustments may be made to the outstanding balance due on closing date, you may be charged separately later, or the cost could be added to a scheduled construction draw.